About the project

start SINCE 2012. Operational status
quantity 16 Number of turbines
houses 27.700 Households supplied
solar wind 36,8 MW Installed capacity
calendar 97 GWh | 2025. Annual generation
co2 13.500 T CO₂ emissions reduction

Zadar 2 Wind Farm is located near the village of Bruška, northeast of Benkovac, in Zadar County, at an elevation of around 600 metres. It forms the western, higher section of the Bruška wind farm and comprises 8 wind turbines with a total capacity of 18.4 MW. Construction was completed in November 2011. This section of the wind farm is visible from the A1 motorway.

Zadar 3 Wind Farm is located east of Bruška, on slightly lower terrain, and also comprises 8 wind turbines of the same rated capacity. It represents the second development phase of the Bruška project and, together with Zadar 2 Wind Farm, forms a single generation asset. The wind farm uses Siemens SWT-93 turbines, each with a rated capacity of 2.3 MW and a rotor diameter of 93 metres.

Specially designed blades keep noise levels to a minimum. The wind farm is connected to the HEP-ODS grid and was granted eligible electricity producer status on 14 February 2012.