About the project

start SINCE 2014. Operational status
quantity 19 Number of turbines
houses 22.800 Households supplied
solar wind 43,7 MW Installed capacity
calendar 80 GWh | 2025. Annual generation
co2 11.100 T CO₂ emissions reduction

Danilo Wind Farm is located in the hilly hinterland of Šibenik, near the village of Danilo and around 15 kilometres from the Adriatic coast. The site features open terrain and favourable wind conditions characteristic of this part of the Dalmatian hinterland. The wind farm comprises 19 Enercon E-82 wind turbines, each with a rated capacity of 2.3 MW, and entered commercial operation on 5 June 2014.

The turbines feature large-diameter blades with an advanced aerodynamic profile, enabling efficient power generation at lower wind speeds while maintaining reliable operation and low noise levels.